For architects · residential & commercial builders · estimators · plan reviewers

Scan architectural plans into material takeoffs and building code audits in seconds.

Upload your proposed floor, framing, and foundation sheets. AutoPlan.systems runs parallel Jev 1.14.0 bounding-box and state calls to populate a structured building model, calculate itemized material takeoffs by floor and room, and flag IRC/IBC code violations before permit submission.

4 pre-loaded architectural sets + custom plan upload · ~0.2s per 128-question Jev batch · 100% deterministic takeoff arithmetic

Live Pipeline Snapshot · Project RES-2026-OAKWOOD (2-Story Residential + Deck)

From 2D framing & floor plans to itemized costs and IRC code remediation.

Interact with this plan set in the Workbench →
Extracted Structure & Multi-Pivot Takeoff
Oakwood Residence · 2 Stories · 2,680 SF + 336 SF Deck
Mid-Grade Custom
1st Floor Framing, Walls, Drywall & Openings
156 LF 2x6 ext walls · 2x8/2x10 joists · 2-ply 11-7/8" LVL girder
$26,840
2nd Floor Framing, Egress Windows & Partitions
142 LF 2x6 ext walls · 33 2x10 DF-L joists · Casement egress windows
$15,490
Exterior Cladding & Attached Rear Deck Total
24'×14' deck · PT framing · LedgerLOKs · 4 Sonotubes · Hardie siding
$36,120
Kitchen Total (Cabinets + Stone Countertops + Sink/Hood)
24 LF perimeter + 9 LF island ($15,720 cabs) · 86 SF quartz ($7,568 tops)
$25,438
Bathroom 1 Total (1st Floor Full Bath)
48" vanity & stone top · Elongated WC · 60"×32" tub/shower package
$4,305
Parallel Jev Code Check → Selective Reasoning Escalation
12 IRC Rules Checked in 184ms · 5 Violations Flagged
5 Code Violations
FAIL · IRC R502.3.1 (Great Room Floor Joist Span)Jev P(pass) = 4%

Drawn 2x8 #2 SPF @ 16" O.C. spans 15'-6", exceeding the 12'-3" maximum in Table R502.3.1(2). Reasoning Agent Fix: Upsize to 2x12 #2 DF-L (+$335).

FAIL · IRC R507.6 & R403.1.4 (Deck Joists & Sonotubes)Jev P(pass) = 2%

Deck joists drawn at 24" O.C. under 5/4 composite decking (16" O.C. max) and Sonotubes drawn at 10"Ø × 30" deep in a 42" frost zone. Fix: 2x10 PT @ 16" O.C. + 16"Ø × 48" piers (+$492).

FAIL · IRC R310.2.2 (Bedroom 3 Egress Window W-204)Jev P(pass) = 3%

Sleeping room window sill drawn at 48" AFF with 4.6 sq.ft. opening (Code requires ≤44" sill & ≥5.7 sq.ft. clear). Fix: 36"×60" Casement @ 36" Sill (+$220).

Why Host Code + Jev Beats End-to-End LLMs

Jev perceives and judges in parallel. Deterministic host code does all the math.

Stage 1 · Jev GuardedBox Vision

Populates a live building model from your floor & framing plans.

Jev bounding-box localization (`GuardedBox`) scans each sheet against our reference library of symbols and assemblies—identifying occupancy (residential vs. commercial), number of floors, total square footage, rooms, walls, fixtures, lumber sizes, O.C. joist spacing, Simpson fasteners, beams, and Sonotube piers.

Stage 2 · Deterministic Host Math

Instant material takeoff & multi-pivot cost rollups.

Host code—never a generative LLM guessing numbers—cross-references every extracted wall, joist bay, header, and room against our 3-tier pricing catalog. View live totals for the 1st Floor vs. 2nd Floor, Exterior Materials, Bathroom 1 Total, or Kitchen Total (broken down into Cabinets, Countertops, and Fixtures).

Stage 3 · 128-Lane Parallel Jev Checks

Checks every span, footing, door & egress window against code at once.

We serialize the extracted building state and run parallel Jev `Noul` and `Choice` batteries across IRC/IBC span tables, deck joist spacing limits, frost footing depths, Sonotube diameters, 32" door clear widths, and 44" bedroom egress window sill heights in ~200ms.

Stage 4 · Selective Reasoning Escalation

Code Book Reasoning Agent invoked only when a check fails or flags.

Passing elements settle immediately in Jev with zero LLM cost. Only failed or borderline flags wake the Building Code Reasoning Agent, which consults the IRC/IBC code corpus, confirms the violation, and offers 1-click engineering fixes with exact takeoff cost deltas.